What a project this has been, though. The room used to be an outdoor porch (prior to our living there) so it is very drafty and cold. So, Andrew installed radiant flooring underneath and also had to do some leveling out of the concrete before he even thought about tiling. Prep work is always so time-consuming and never gets the credit it deserves since it's not really seen in the final product. And then, of course, Andrew opted to take the "easy route" by laying the tiles on the diagonal, adding a decorative border and a small pattern throughout the room. He's always looking for the shortcut when doing these things (ahem, not!) :). It looks great, though, and we are excited that the end is in sight. He is nearly done with the laying of tile and will then just need to grout and seal it.
Here is a photo of Andrew and his helper Ben :) working recently. Ben is very serious about his apprentice job and always changes into his work jeans and gets the appropriate tools for the job :)
Andrew, hard at work!











Here is one other photo of the opposite side of the room, showing my own work table in the bay window and the tall white cabinet that I have filled entirely with kids craft supplies. Ben loves this!





Finally, the family room. This is where we spend most of our time during the day (well, the kitchen and the playroom follow closely behind). Again, curtains are needed here.



